On Sept. 18 WC Maloney Inc. started preparation work for the removal of Canyon Bridge. On Sept. 20 the heavy duty equipment should arrive and demolition will begin. The first two days of the week were used to protect the creek bed so debris is not carried by the current. At the same time installation of the concrete replacement culvert began in the sinkhole. Once this is finished, the sections will be sealed before the hole is closed and the road repaired.