|
|
|
|
Submit
|

Custom Search
CivicLifeSportsSchoolsBusinessFoodOur HomesLetters/OpinionsCalendar

Published May 18th, 2016
ConFire Board Approves Complete Rebuild of Fire Station 16

Western Lafayette residents moved one step closer to full fire service coverage May 9 when the Contra Costa County Fire Protection District board unanimously approved the total rebuild of fire station 16 on Los Arabis Road.
The fire station was seriously damaged in 1989 by the Loma Prieta earthquake and the crews worked out of a mobile home on the site for more than 20 years before the facility was shut down in 2012. When a proposed joint venture with the Moraga-Orinda Fire District to build fire station 46 at the Orinda-Lafayette border collapsed, ConFire determined that rebuilding station 16 from scratch was the most appropriate solution for the western Lafayette area. The district had considered refurbishing the existing structure but decided it was not cost effective to do that.
Fire Chief Jeff Carman explained to the board why the Lafayette station was the first to be put back into service of the four stations closed by the district in 2012. "Lafayette is one of the few areas in California located in a very high fire hazard severity zone," he said. "If we had a fire in those hills it would be similar to the Oakland Hills fire. Property values are extremely high and egress routes are extremely limited." Carman stressed that the county could be devastated economically if the Lafayette area remains without adequate fire protection.
"We stand behind the chief," Lafayette fire commissioner Bill Granados said. "Rebuilding station 16 is the best thing for the district at this time."
Deputy Chief Lewis Broschard told the board that the construction estimate ranges from $3.5 to $4 million, including design, engineering and other soft costs, with completion likely in 18 to 24 months. ConFire will staff the station with transferred firefighters from station 1 in Walnut Creek and an additional captain, which will increase district operating costs $1 million a year.
"I would have been fine with station 46, but we will end up with better coverage for Lafayette," board chair Candace Andersen said.
The city of Lafayette planning department and ConFire will hold a joint public meeting to receive feedback from the neighborhood on the design of the new station at 7 p.m. May 25 at the Lafayette city offices, 3675 Mt. Diablo Boulevard, Suite 240.


print story

Before you print this article, please remember that it will remain in our archive for you to visit anytime.
download pdf
(use the pdf document for best printing results!)
Comments
Send your comment to:
Reach the reporter at:

This article was pulished on Page A8:



Quick Links for LamorindaWeekly.com
Home
Archive
Advertise
send artwork to:
ads@lamorindaweekly.com
Classified ads
Lamorinda Service Directory
About us and How to Contact us
Submit
Letter to the Editor
Send stories or ideas to:
storydesk@lamorindaweekly.com
Send sports stories and photos to:
sportsdesk@lamorindaweekly.com
Subscribe to receive a delivered or mailed copy
Subscribe to receive storylinks by email
Content
Civic
Lafayette
Moraga
Orinda
MOFD
Life
Sports
Schools
Business
Food
Our Homes
Letters/Opinions
Calendar


Copyright Lamorinda Weekly, Moraga CA